Webster has all the key ingredients to become a major employment center within New York’s Finger Lakes region. Chief among them is the myriad public and private infrastructure that support growth and investment throughout the community. The Town and Village are bisected by NY Route 104, a limited-access state highway with nine interchanges in Webster. Four of these are in the 1,400-acre North East Area for Technology industrial zone. The Town is serviced by a new regional water treatment facility with over 15 MGD of excess capacity and the capability to provide 10,000 tons of naturally chilled water for space/process cooling. Electric power into the NEAT zone is 34 kV and 115kV, and is paralleled by a 6” high-pressure natural gas main.
- State Route 104 Limited Access Highway: 9 Total Interchanges;
- Ontario-Midland Railroad provides 286x rail access;
- North East Area for Technology: 1,400-acre, 7 MSF Industrial Hub;
- Eastside Water Treatment Plant: 50 MGD capacity, 15-20 MGD available;
- Chilled Water: Capability to draw 10,000 tons of naturally chilled water;
- 115kv power and high-pressure natural gas in industrial zone.